Question: Generating capacity connected to the bus bars and ready to take load when switched on is known as____________?
- 1. firm power
- 2. cold reserve
- 3. hot reserve
- 4. spinning reserve
Question: _________offers the highest electric load.
- 1. Television set
- 2. Toaster
- 3. Vacuum cleaner
- 4. Washing machine
Question: ___________ is invariably used as base load plant.
- 1. Diesel engine plant
- 2. Nuclear power plant
- 3. Gas turbine plant
- 4. Pumped storage plant
Question: In case of _________ fuel transportation is the major problem.
- 1. diesel power plants
- 2. nuclear power plants
- 3. hydro-electric power plants
- 4. thermal power plants
Question: Which of the following power plants need the least period for installation ?
- 1. Thermal power plant
- 2. Diesel power plant
- 3. Nuclear power plant
- 4. Hydro-electric power plant
Question: __________ is invariably used for peak load.
- 1. Nuclear power plant
- 2. Steam turbine plant
- 3. Pumped storage plant
- 4. None of the above
Question: Which of the following is the essential requirement of peak load plant ?
- 1. It should run at high speed
- 2. It should produce high voltage
- 3. It should be small in size
- 4. It should be capable of starting quickly
Question: By the use of which of the following power factor can be improved?
- 1. Phase advancers
- 2. Synchronous compensators
- 3. Static capacitors
- 4. Any of the above
Question: An induction motor has relatively high power factor at__________?
- 1. rated r.p.m.
- 2. no load
- 3. 20 percent load
- 4. near full load
Question: In a distribution system, in order to improve power factor, the synchronous capacitors are installed__________?
- 1. at the receiving end
- 2. at the sending end
- 3. either A or B
- 4. none of the above