Question: Generating capacity connected to the bus bars and ready to take load when switched on is known as____________?
  • 1. firm power
  • 2. cold reserve
  • 3. hot reserve
  • 4. spinning reserve
Question: _________offers the highest electric load.
  • 1. Television set
  • 2. Toaster
  • 3. Vacuum cleaner
  • 4. Washing machine
Question: ___________ is invariably used as base load plant.
  • 1. Diesel engine plant
  • 2. Nuclear power plant
  • 3. Gas turbine plant
  • 4. Pumped storage plant
Question: In case of _________ fuel transportation is the major problem.
  • 1. diesel power plants
  • 2. nuclear power plants
  • 3. hydro-electric power plants
  • 4. thermal power plants
Question: Which of the following power plants need the least period for installation ?
  • 1. Thermal power plant
  • 2. Diesel power plant
  • 3. Nuclear power plant
  • 4. Hydro-electric power plant
Question: __________ is invariably used for peak load.
  • 1. Nuclear power plant
  • 2. Steam turbine plant
  • 3. Pumped storage plant
  • 4. None of the above
Question: Which of the following is the essential requirement of peak load plant ?
  • 1. It should run at high speed
  • 2. It should produce high voltage
  • 3. It should be small in size
  • 4. It should be capable of starting quickly
Question: By the use of which of the following power factor can be improved?
  • 1. Phase advancers
  • 2. Synchronous compensators
  • 3. Static capacitors
  • 4. Any of the above
Question: An induction motor has relatively high power factor at__________?
  • 1. rated r.p.m.
  • 2. no load
  • 3. 20 percent load
  • 4. near full load
Question: In a distribution system, in order to improve power factor, the synchronous capacitors are installed__________?
  • 1. at the receiving end
  • 2. at the sending end
  • 3. either A or B
  • 4. none of the above