Question: Size, capacity and materials need be specified for__________________?
  • 1. Bib-cocks
  • 2. Stop-cocks
  • 3. Ball valves
  • 4. All the above
Question: The floor area includes the area of the balcony up to_________________?
  • 1. 100 %
  • 2. 75 %
  • 3. 50 %
  • 4. 25 %
Question: The weight of an item is measured correct to nearest_________________?
  • 1. 0.25 kg
  • 2. 0.50 kg
  • 3. 0.75 kg
  • 4. 1.00 kg
Question: Berms are provided in canals if these are__________________?
  • 1. Fully in excavation
  • 2. Partly in excavation and partly in embankment
  • 3. Fully in embankment
  • 4. All the above
Question: Pick up the correct statement from the following?
  • 1. The estimated value of the work excluding the amount for contingencies, work charged establishment, tool and plants, is called work value
  • 2. The actual expenditure involved to complete a work including incidental, establishment and travelling charges, is called actual cost
  • 3. The formal acceptance by the administrative department for incurring an expenditure on the work, is called administrative approval
  • 4. All the above
Question: Pick up the correct statement from the following?
  • 1. The earth work of cutting in trenches or borrow pits in fairly uniform ground is measured with the help of average depths of the dead men
  • 2. The earth work in trenches or borrow pits in irregular ground is measured by taking the difference in levels before and after completion of work
  • 3. The earth work in trenches or borrow pits, where neither a nor b is feasible, are measured from the fillings after deduction of voids
  • 4. All the above
Question: Referring of given figure, pick up the correct statement from the following?
  • 1. The total length of centre line of four walls is 20 m
  • 2. Length of long wall out-to -out is 6.80 m
  • 3. Length of short walls in-to-in is 3.20 m
  • 4. All the above
Question: Pick up the incorrect statement from the following?
  • 1. Lead is the average horizontal straight distance between the borrow pit and the place of spreading soil
  • 2. The lead is calculated for each block of the excavated area
  • 3. The unit of lead is 50 m for a distance upto 500 m
  • 4. The unit of lead is 1 km where the lead exceeds 2 km
Question: Pick up the correct statement from the following?
  • 1. In order to check up the average depth of excavation, ‘Dead man s’ are left at the mid-widths of borrow pits
  • 2. The earthwork calculation in excavation is made from the difference in levels obtained with a level
  • 3. The earth work in excavation to form the road embankment includes the formation of correct profile and depositing the soil in layers
  • 4. All the above
Question: Pick up the correct statement from the following ?
  • 1. Pointing is measured in sq.m
  • 2. Plastering is measured in sq.m
  • 3. Glazing is measured in sq.m
  • 4. All the above