Question: Pick up the incorrect statement from the following ?
  • 1. No deduction is made for the volume occupied by reinforcement
  • 2. No deduction is made for the openings upto 0.1 sq.m
  • 3. No deduction is made for volumes occupied by pipes, not exceeding 100 sq.cm in cross-section
  • 4. None of these
Question: Pick up the correct statement from the following?
  • 1. Bricks are paid per thousand
  • 2. Cement is paid per 50 kg bag
  • 3. Lime is paid per quintal
  • 4. All the above
Question: Pick up the correct statement in case of water supply ?
  • 1. Pipes laid in trenches and pipes fixed to walls are measured separately
  • 2. Cutting through walls and floors are included with the item
  • 3. Pipes are classified according to their sizes and quality
  • 4. All the above
Question: Pick up the incorrect statement from the following?
  • 1. The built up covered area at the floor level of any storey of a building is called plinth area
  • 2. The usable covered area of the rooms of any storey of a building is called carpet area
  • 3. The carpet area of a building along with area of its kitchen, pantry, store, lavatory, bath room and glazed veranda, is called floor area
  • 4. None of these
Question: Pick up the incorrect statement from the following?
  • 1. Dimensions are measured to the nearest 0.01 m
  • 2. Areas are measured to the nearest 0.01 sq.m
  • 3. Cubic contents are measured to the nearest 0.1 cum
  • 4. Weights are measured to the nearest 0.001 tonnes
Question: The slope of the outlet of ‘P trap’ below the horizontal is kept________________?
  • 1. 8°
  • 2. 10°
  • 3. 12°
  • 4. 14°
Question: The expected out turn of half brick partition wall per mason per day is___________________?
  • 1. 1.5 m 3
  • 2. 2.0 m3
  • 3. 4.0 m2
  • 4. 5.0 m2
Question: For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is_______________?
  • 1. 0.90 m3
  • 2. 0.94 m3
  • 3. 0.98 m3
  • 4. 1.00 m3
Question: For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is___________________?
  • 1. 0.200 m3
  • 2. 0.247 m3
  • 3. 0.274 m3
  • 4. 0.295 m3
Question: The height of the sink of wash basin above floor level is kept____________________?
  • 1. 60 cm
  • 2. 70 cm
  • 3. 75 cm to 80 cm
  • 4. 80 cm