Question: The aggregates required for one kilometer length of water bound macadam road per meter width and for 10 mm thickness is________________?
- 1. 8 cubic meter
- 2. 10 cubic meter
- 3. 12 cubic meter
- 4. 15 cubic meter
Question: The binder normally used in flexible pavement construction is________________?
- 1. cement
- 2. lime
- 3. bitumen
- 4. none of the above
Question: For the construction of water bound macadam roads, the correct sequence of operations after spreading coarse aggregates is________________?
- 1. dry rolling, wet rolling, application of screening and application of filler
- 2. dry rolling, application of filler, wet rolling and application of screening
- 3. dry rolling, application of screening, wet rolling and application of filler
- 4. dry rolling, application of screening, application of filler and wet rolling
Question: When the bituminous surfacing is done on already existing black top road or over existing cement concrete road, the type of treatment to be given is________________?
- 1. seal coat
- 2. tack coat
- 3. prime coat
- 4. spray of emulsion
Question: The most suitable equipment for compacting clayey soils is a_______________?
- 1. smooth wheeled roller
- 2. pneumatic tyred roller
- 3. sheep foot roller
- 4. vibrator
Question: Most suitable material for highway embankments is______________?
- 1. granular soil
- 2. organic soil
- 3. silts
- 4. clays
Question: The camber of shoulders in water bound macadam roads is________________?
- 1. equal to the cross slope of pavement
- 2. less than the cross slope of pavement
- 3. greater than the cross slope of pavement
- 4. zero
Question: In highway construction, rolling starts from________________?
- 1. sides and proceed to centre
- 2. centre and proceed to sides
- 3. one side and proceed to other side
- 4. any of the above
Question: In the penetration macadam construction, the bitumen is__________________?
- 1. sprayed after the aggregates are spread and compacted
- 2. premixed with aggregates and then spread
- 3. sprayed before the aggregates are spread and compacted
- 4. none of the above
Question: Which of the following premix methods is used for base course ?
- 1. bituminous carpet
- 2. mastic asphalt
- 3. sheet asphalt
- 4. bituminous bound macadam