Question: The aggregates required for one kilometer length of water bound macadam road per meter width and for 10 mm thickness is________________?
  • 1. 8 cubic meter
  • 2. 10 cubic meter
  • 3. 12 cubic meter
  • 4. 15 cubic meter
Question: The binder normally used in flexible pavement construction is________________?
  • 1. cement
  • 2. lime
  • 3. bitumen
  • 4. none of the above
Question: For the construction of water bound macadam roads, the correct sequence of operations after spreading coarse aggregates is________________?
  • 1. dry rolling, wet rolling, application of screening and application of filler
  • 2. dry rolling, application of filler, wet rolling and application of screening
  • 3. dry rolling, application of screening, wet rolling and application of filler
  • 4. dry rolling, application of screening, application of filler and wet rolling
Question: When the bituminous surfacing is done on already existing black top road or over existing cement concrete road, the type of treatment to be given is________________?
  • 1. seal coat
  • 2. tack coat
  • 3. prime coat
  • 4. spray of emulsion
Question: The most suitable equipment for compacting clayey soils is a_______________?
  • 1. smooth wheeled roller
  • 2. pneumatic tyred roller
  • 3. sheep foot roller
  • 4. vibrator
Question: Most suitable material for highway embankments is______________?
  • 1. granular soil
  • 2. organic soil
  • 3. silts
  • 4. clays
Question: The camber of shoulders in water bound macadam roads is________________?
  • 1. equal to the cross slope of pavement
  • 2. less than the cross slope of pavement
  • 3. greater than the cross slope of pavement
  • 4. zero
Question: In highway construction, rolling starts from________________?
  • 1. sides and proceed to centre
  • 2. centre and proceed to sides
  • 3. one side and proceed to other side
  • 4. any of the above
Question: In the penetration macadam construction, the bitumen is__________________?
  • 1. sprayed after the aggregates are spread and compacted
  • 2. premixed with aggregates and then spread
  • 3. sprayed before the aggregates are spread and compacted
  • 4. none of the above
Question: Which of the following premix methods is used for base course ?
  • 1. bituminous carpet
  • 2. mastic asphalt
  • 3. sheet asphalt
  • 4. bituminous bound macadam